This material is not to be used, reproduced, stored or transmitted for commercial purposes without written permission from the Government of Alberta. The source of this material must be acknowledged when publishing or issuing it to others. This material may be used, reproduced, stored or transmitted for non-commercial purposes. If there is any inconsistency or conflict between any of this material and the legislation, the legislation shall prevail. If in doubt with respect to any information contained within this material, or for confirmation of legal requirements, please refer to the official Statutes and Regulations of Alberta. The Crown, its agents, employees or contractors will not be liable to you for any damages, direct or indirect, arising out of your use of this material. The brackets are fastened through the existing slates to provide a base for a roof scaffold of. The official Statutes and Regulations should be consulted for all purposes of interpreting and applying the law. Often roof brackets are needed to access existing slate roofs. The Extreme Bracket® can be adjusted 1 degree at a time from 18 degrees to 90 degrees. The Extreme Bracket® is a heavy-duty roof scaffolding bracket with a crank handle that enables the user to adjust the bracket angle to the exact pitch of the roof. Note: No more than 2 employees shall occupy any given 8 feet of a carpenter’s wall bracket scaffold at any one time. All persons making use of consolidated legislation are reminded that it has no legislative sanction, that amendments have been embodied for convenience of reference only. Uniquely designed, fully adjustable, heavy-duty roof bracket. Guard rails are required for platforms over 10 in height. The material provided is solely for the user’s information and convenience. This material is sourced from the Alberta King’s Printer consolidation of the Occupational Health and Safety Act, Occupational Health and Safety Regulation and Occupational Health and Safety Code and, while thought to be accurate, is provided without warranty of any kind. Under-tile connector: The low-profile under-toe connector allows our bracket to be safely secured under tiled roofs. Suspended platform is braced to prevent swaying. Platforms are completely planked between the hangers, and On blocks that are secured to the side of the hangers below each beam as an To the vertical hangers at least 300 millimetres above the bottom of the Suspended platform is supported by lumber beams that are 38 millimetres by 140 To a block that rests on the top edge of each thrustout as an additional Maximum distance between thrustouts is 2.3 metres,Ī working platform is suspended or thrust out, the platform isīy vertical lumber hangers that are 38 millimetres by 140 millimetres or largerĪnd not more than 3 metres long secured to the side of each thrustout andĮxtending at least 300 millimetres above the top of each thrustout, and Than 1.5 times the length of the outboard portion, Inboard portion from the fulcrum point to the point of anchorage is not less Pursuant to an administrative stay effective Novemand published in the Federal Register on November 25, 1996, the requirement in paragraph (b)(2)(i) that roof bracket scaffolds be at least 12 inches wide is stayed until Novemor until rulemaking regarding the minimum width of roof bracket scaffolds has been completed. Inboard ends of thrustouts are securely anchored against horizontal or vertical Failure to do so could result in serious injury or death.Ī,, bigrocksupply.Are constructed of lumber that is 89 millimetres by 140 millimetres and placedĭo not extend more than 2 metres beyond the edge of the bearing surface,Īre securely braced at the fulcrum point against movement or upset, Warning: Users must strictly adhere to the manufacturer’s inspection, installation, maintenance and use directions and must follow local, state and federal safety regulations. Work platform is fully planked and guardrails are installed. Line up bolt on staging bracket (in vertical position) with sheathing and stud, attach handle to bolt and tighten until bracket is firmly in place. Drill 5/8" hole 2" from stud into the sheathing and into 2"x 4" plank long enough to span the interior studs. Must be installed directly onto walls sheathed with 3/4" thick exterior grade plywood. Walls must be adequately braced to support the system. Phase of Constructionįloor joist installation, roof truss installation, window installation, roof sheathing, shingling Minimum of 2 units needed for the system. Guardrail available when installed over 6 feet above ground toe board also required. Bracket that bolts through walls to support 36" platform (2" thick planks) with 2 workers and an additional 75 pounds per 8' section.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |